Saturday, March 5, 2011

Types Of Business Contract

Stresa: Tomorrow is the Half Marathon: Here are the roads closed

The presence of more than 2,500 runners tomorrow morning and hundreds of coaches and fans on the road that leads to Stresa Verbania for the 4th edition of the Lago Maggiore Half Marathon entail changes to the movement. Given the connection with the Carnival à the start of the competition from the lakeside of Stresa was anticipated to 10 (compared to the traditional schedule of 11). in Stresa, 33 from the main road south to route via the Simplon in Baveno of Victory, which is equivalent to stretch
first five kilometers of the race, will be closed to traffic from 9.50 to 10.50.

From 10 to 11 will be strictly forbidden to move the dock instead of the roundabout in Baveno Feriolo, located 7.5 km to race, even in that stretch will be closed the road to Sempione National Euphrates and that of Feriolo.

From the roundabout to the town of Feriolo Fondotoce (12 km mark of the race) the road will be closed to traffic from 10 am to 11.40. It will therefore not take part of Via Nazionale to Via Quaranta, way Piano Grande, via per Feriolo, la rotonda, fino all’ingresso a Fondotoce. La stessa rotonda sarà aperta solo per chi è diretto a Bieno, Gravellona o Mergozzo. Il tratto di strada tra Fondotoce e Suna sarà chiuso dalle 10,15 alle 12,15. In questo lasso di tempo non si potrà percorrere via 42 Martiri e tutta via Troubetzkoy.
(Di Luca Bilardo su La Stampa)

0 comments:

Post a Comment